Ormeau rail facility
We are in the process of constructing a new rail facility at Ormeau that will support the Queensland Train Manufacturing Program fleet...
We are in the process of constructing a new rail facility at Ormeau that will support the Queensland Train Manufacturing Program fleet...
We have started work on the business case for the Pacific Motorway (M1) – Daisy Hill to Logan Motorway upgrade...
The 3.5km Sports Drive to Gateway Motorway (SD2GM) upgrade project is the first package of work within the broader 8km M1 North upgrade – Stage 2...
We are undertaking the detailed design phase for the Watland Street to Sports Drive section of the Pacific Motorway (M1), as part of a rolling program of M1 upgrades...
The M1 between Burleigh and Palm Beach (Package B) is being upgraded as part of the VL2T upgrade and will include significant environmental features through this sensitive section of the upgrade...
We are planning for short and long-term upgrades of various interchanges on the Pacific Motorway (M1), including Exit 38 (Yatala North), Exit 41 (Yatala South), Exit 45 (Ormeau) and Exit 49 (Pimpama)...
The Pacific Motorway (M1) Varsity Lakes to Tugun is being upgraded and will be delivered in stages...
We are upgrading the Pacific Motorway (M1) Varsity Lakes to Tugun (VL2T) and it will be delivered in packages...
The $1 billion Pacific Motorway Varsity Lakes to Tugun (VL2T) project is being delivered to upgrade 10 kilometres of the M1...
We are undertaking the Eight Mile Plains to Daisy Hill upgrade that will improve 8kms of the Pacific Motorway M1 between the Gateway Motorway and Loganlea Road...
We are upgrading the Pacific Highway (western service road) between Moss Street and Carlyle Street, Slacks Creek...
We are currently undertaking preliminary and detailed design of the Rochedale bus station and park ‘n’ ride facility that will improve public transport access, connectivity and travel time reliability...
The Exit 49 interchange upgrade will deliver significant improvements in safety and traffic flow efficiency by keeping traffic moving through the improved interchange and thereby reducing queuing...
Repairs are underway across Far North Queensland after extensive, severe damage to the state-controlled road network was caused by Tropical Cyclone Jasper in December 2023...
Park Ridge Connector is a preserved future transport corridor to connect communities planned at Park Ridge, Flagstone and Yarrabilba to services and employment...
This project aims to improve the flood immunity and reduce flood closure times at the Pialba–Burrum Heads Road crossing...
The Australian and Queensland Governments are investigating improved freight access to the Port of Brisbane...
This upgrade will improve safety and increase capacity along a 1.5-km section of Proserpine - Shute Harbour Road by widening from 2 to 4 lanes, upgrading key intersections, and installing a new shared...
Proserpine – Shute Harbour Road will benefit from a $21 million flood immunity upgrade at Hamilton Plains between the Bruce Highway turn-off and Strathdickie Road...
The new, modern train fleet will provide passengers with more efficient, reliable, and accessible travel across South East Queensland...
Last updated: 19 July 2024