Torbanlea train manufacturing facility
We are expected to start construction of the Queensland Train Manufacturing Program manufacturing facility in 2024...
We are expected to start construction of the Queensland Train Manufacturing Program manufacturing facility in 2024...
A new upstream bridge will be constructed over Ross River in Townsville adjacent to the existing Bowen Road Bridge...
We are upgrading Townsville Connection Road to dual lanes between University Road and Bowen Road Bridge...
The Townsville Eastern Access Rail Corridor (TEARC) project is a proposed 8.3km rail freight line connecting the North Coast rail line directly into the Port of Townsville...
We're relocating the Trinder Park train station to improve accessibility, safety, and overall customer experience as part of the Logan and Gold Coast Faster Rail project...
The department is collaborating with Economic Development Queensland to develop a master plan to help guide future activities at Urangan State Boat Harbour and the broader harbour precinct...
The V1 Birdwood Road velobridge will improve safety, traffic flow and network connectivity...
The Veloway 1 O'Keefe Street velobridge will remove the need for bike riders to cross at the lights east and west of the Pacific Motorway on O'Keefe Street...
The Veloway 1 (V1) is a dedicated bikeway designed to connect people riding bikes between Lower River Terrace, South Brisbane and Eight Mile Plains, adjacent to the Pacific Motorway...
The Veloway 1 Pacific Motorway (V1) is a cycleway between South Brisbane and Underwood...
We are building a new 2-lane rural highway to connect Peak Downs Highway west of Walkerston to the Mackay Ring Road near Paget...
The Department of Transport and Main Roads (TMR) undertook community consultation on a proposed Warrego Highway – Mount Crosby Road interchange upgrade in mid-2020...
The Bremer River Bridge project includes critical rehabilitation and strengthening repair works, including bridge re-decking, to extend the life of the existing westbound bridge structure...
This project involves improvements to the Warrego Highway (Miles – Roma) and Wallumbilla South Road intersection...
This project involves widening a 7km section of the Warrego Highway west of Wallumbilla...
This project will design and construct a range of safety improvements along the Warrego Highway, between Toowoomba and Dalby, to reduce the risk of fatigue-related crashes...
The Warrego Highway East master plan builds on the Warrego Highway Upgrade Strategy released by the Queensland Government in 2012...
The Western Brisbane Transport Network Strategy provided a transport vision for developing a fully integrated transport network for western and north-western Brisbane that caters for walking, cycling...
We're upgrading the Woodridge train station to improve accessibility, safety, and overall customer experience as part of the Logan and Gold Coast Faster Rail project...
Yandina—Coolum Road, South Coolum Road and School Road, upgrade roundabout...
Last updated: 19 July 2024